So we resumed our journey down to the end. No sunshine but no wind either and it was dry So no complaining. |
To be on the safe side I called the bridge keeper. We were told to come on down, they did have problems but we should be able to pass through.
Purton Upper Bridge We made it through but then had to wait until it was closed and the bridge keeper had cycled to Purton Lower Bridge to open that one. |
Not much further and we reach our destination Seen here is one of the supports of the Old Severn Railway Bridge. |
We had our pick of the best mooring place as they were very few boats. A quick text to Sue to say we had arrived just a day later than planned. She was staying with her sister Carol nearby so just before lunch they both arrived to visit. Sadly Carol had to leave almost as soon as they had arrived but Sue stayed on and we had a great time reminiscing about our days in Larnaca Marina nearly 30 years ago.....sounds terrible when I put a figure to it!
The weather was kind to us and it was a sunny afternoon and into the early evening which we rounded off with a gentle glass of Pimms. |
Elapsed time:1h25m31s
Locks:0
Bridges:3
Average speed:3.08 mph (3.08 lock/mph)
Average speed:3.08 mph (3.08 lock/mph)
No comments:
Post a Comment