I even said I would do the first lifting bridge which was a mistake as it was very stiff and took far too many turns to lift the tiddly little bridge. |
We met a couple of boats coming up which makes passing in some of the short pounds quite interesting.
After 13 locks we moored below lock 33 where there are 48 hour moorings as I wanted to visit the canal shop nearby. I was also in need of my morning cup of coffee. The shop also sells home made cakes and I bought us a piece each which sadly has to be kept until tomorrow as today is one of our 2 days (doing the 5 and 2 diet!)
The moorings are not unpleasant and I casually suggested we call it a day as it was about 12.30 by then but no luck...Geoff was determined to carry on.
and so to the last lock, our 19th of the day |
Once we were round the corner I was sent to sit in my preferred position in the bow to watch the world go by. Geoff had a mooring place in mind which we reached after about 3/4 of an hour. Quite up to our standard....lovely and open, not hemmed in by trees.
AND TOMORROW I AM PROMISED A LAYOVER DAY! We shall see.
Total distance:4.1 miles
Elapsed time:5h35m40s
Locks:19
Bridges:15
Average speed:1.05 mph (3.61 lock/mph)
Average speed:1.05 mph (3.61 lock/mph)
No comments:
Post a Comment